Enclosing the lanai is a build, not a modification. When a shaded outdoor room is the better answer.
Call (352) 630-3999Home additions in Horizon West
Almost every addition conversation we have in Horizon West starts in the same place, which is the covered space at the back of the house. Somebody wants it enclosed, or extended, or turned into a room.
That is a sensible instinct. It is the only part of these lots with any room left on it, it already has a roof and a slab, and it is the obvious place to grow.
What surprises people is that enclosing it is not the small job it looks like. A covered outdoor area and a conditioned room are two different buildings that happen to occupy the same footprint, and turning one into the other means dealing with a slab, a roof and a structure that were all built to be outside.
None of that makes it a bad idea. It makes it a project rather than a modification, and knowing that at the start is the difference between a happy outcome and a series of unwelcome numbers.
Why enclosing a lanai is not free
Four things have to change and each is a real item.
The slab was poured as an exterior surface, which means it slopes away from the house so water runs off it. A conditioned room wants a level floor, and levelling it means either building the floor up, which raises it above the house floor and creates a step, or accepting a floor that falls perceptibly across the room.
The roof was built to shelter an outdoor space. It frequently has no insulation, and where it is a low-slope structure it may not be built for the loads or the detailing that a conditioned space requires.
The perimeter is usually screen on light aluminium framing, which is not structure. Enclosing means building real walls with a real foundation under them, on a slab edge that was never intended to carry a wall.
And the mechanical system was sized for the house as built. A new conditioned room at the far end of the ductwork is a room that will be uncomfortable unless something is done about it.
The step, and what to do about it
Of those four, the floor is the one that most often decides how the project turns out and it is worth thinking about properly.
Building the new floor up to meet the existing house level is the clean answer and it produces a room that reads as part of the house. It costs the height, which means the ceiling in the new room is lower than the house by whatever was added, and where the covered area had a low ceiling to begin with that can matter.
Leaving the slab as it is and accepting a step down into the room is cheaper and it is a legitimate design if the step is made deliberate: generous, well lit, and with a change of material that says it is there on purpose.
What does not work is a small step at a doorway with nothing announcing it. That is a hazard forever and it is what happens when this decision gets made by default rather than deliberately.
The third option, which is grinding or overlaying the existing slope out, works over a small fall and stops being economical over a large one.
The better answer, quite often
Before enclosing anything, it is worth asking what the household actually wants, because a large share of the time the answer is a usable outdoor room rather than another interior one.
These covered spaces go unused for consistent and fixable reasons. They face the wrong way and take the afternoon sun. There is no shade beyond the roof itself. There is no lighting, so the space stops existing after dark. There is one outlet in an inconvenient place. And nothing moves the air.
Ceiling fans, real lighting, shade on the exposed side and enough power convert a passage into a room, and none of it is a large project or a permitted one in most cases.
Extending the covered area is the next step up and it is still far cheaper per square foot than conditioned space, because it needs no insulation, no mechanical system and no envelope.
In this climate a well-designed covered outdoor room is used more days of the year than an interior room, and it is the addition that consistently outperforms what people expect from it.
We would rather propose that first and be told no than sell an enclosure to somebody who wanted somewhere to sit outside.
Screen enclosures, and what they are
Where a pool cage or screen enclosure is in the picture, it is worth being clear about what it is and is not.
It is a light aluminium structure designed to hold screen and resist wind. It is not a building, it does not carry roof loads, and it cannot be built upon.
That matters when somebody wants to enclose part of it, because the existing cage frame is not the frame of the new room. Real walls need their own structure and their own foundation, and the cage generally gets partly dismantled rather than incorporated.
Screen enclosures are permitted structures with their own requirements, and they have a service life. Corroded fixings and a sagging panel are the visible signs, and rescreening is inexpensive relative to what it does for how a property looks.
Where the goal is to keep insects out of a covered space without conditioning it, screening the existing cover is a small project and frequently the right one.
What lot coverage allows
On these lots this is the constraint that decides whether anything can be built at ground level, and it is worth checking before design.
Setbacks define an envelope inside which anything can be built, and the existing house frequently sits close to at least one of those lines.
Lot coverage limits the proportion of the parcel under building. A house with a lanai, a pool and a driveway may already be near it, which means anything added has to come from somewhere.
The question worth asking specifically is how the existing covered area counts. Some jurisdictions count covered area whether or not it is enclosed, in which case enclosing it changes nothing on that measure and the project is easier. Others count only enclosed area, in which case enclosing consumes headroom you might want for something else.
Easements are the item people are surprised by, and drainage easements along rear boundaries are common in these developments.
Building up, where the ground is spoken for
Where the lot has nothing left, the remaining direction is upward, and it is a genuinely different project.
A room over the garage is the usual candidate. It uses no lot coverage, it is a bounded project rather than a whole new floor, and the garage below is not a room anybody has to move out of.
The structural question is not a matter of opinion. A garage was built to carry a roof, which is a light and evenly distributed load, and a floor with people and furniture on it is different. Whether it can take that is established by an engineer looking at what is there.
Access is the constraint that decides whether it works, and it should be resolved before the structure question. A room reached from the existing landing is genuinely useful. One reached only through another bedroom makes both rooms worse.
And the garage ceiling becomes a floor with people on it, which means real insulation, a proper assembly and the fire separation that a habitable space above a garage requires.
Conditioning a room the system was not sized for
Whatever gets built, this is the item most often left out of a first estimate and most often responsible for a disappointing room.
The existing system was sized for the house as delivered. Adding conditioned area means either replacing it with something larger, which is a whole-house decision made for one room, extending the ductwork and accepting that the new room and whatever was previously last in line will both be marginal, or giving the addition its own system.
Our usual recommendation is the third. A separate unit serving the addition means it performs properly, it can be shut off when the room is not in use, and it does not degrade the rest of the house.
On an enclosed lanai it is close to essential, because that room has more glass and more exterior surface than any other room in the house and it sits at the end of everything.
The other half is the envelope. An enclosed lanai with an uninsulated roof over it will be uncomfortable regardless of what equipment serves it, and insulating that roof is not optional.
Glass, and what it does to a room facing the wrong way
The appeal of an enclosed lanai is that it is mostly glass, and that is also the problem to solve rather than ignore.
A room with a large west-facing glazed wall in this climate is unusable in the afternoon unless the glass is doing something about it. A coating chosen for this climate rejects heat that a plain unit passes straight through, and it can be specified without the tint people associate with it.
Impact-rated units do two jobs, since the same construction that resists a windborne object handles wind load, and it removes the question of who is putting up shutters when a storm is forecast.
Shade is architectural rather than technical and it does more than any glass specification. Keeping some of the original overhang, or adding a projection above the glazed wall, is what makes the room usable at four in the afternoon.
And where the wall between the house and the new room comes out, that opening is structural work in the existing exterior wall, sized for what it carries.
Community approval, which runs on its own clock
The villages here are governed by community development districts and homeowners associations, and an addition changes the exterior, which puts it squarely in scope.
What is reviewed is the elevation, the materials, the colours and the roof, and some communities have specific rules about how much a house can be extended and what may appear at the rear.
That approval is separate from the building permit and does not run at the same speed. Started early it runs in parallel and costs nothing. Started late it runs in series and adds weeks, and it is the single most avoidable delay in an addition here.
How the job runs is governed too: contractor hours, gate registration, where a container may sit and for how long, and parking.
We read the rules before quoting and submit early, because a design that will not be approved is worse than no design.
Permits in unincorporated Orange County
Horizon West is unincorporated Orange County, so permits go to the county and there is no municipal building department in the picture.
An addition is a full permit with structural, plumbing, electrical and mechanical components, engineered drawings and inspections through the build.
Enclosing a covered area is permitted work without exception, because it creates conditioned space, and it is the item people are most tempted to treat as a modification rather than a build.
That temptation is worth resisting, because unpermitted conditioned area is a question mark on a house this new and it surfaces at sale, which is exactly the moment nobody wants it.
Building over an existing structure brings structural review of that structure as well as the new work, which is why the engineering happens before the permit rather than after.
The outdoor kitchen, and doing it once
Where the decision is to keep the space outdoors and make it better, an outdoor kitchen is the addition that gets asked about most and the one most often built twice.
Built twice because the first version is a grill on a cart and a small counter, and within two years the household has discovered what it actually wanted, which is a sink, somewhere cold, and enough counter to put things down on.
The items that decide whether one works are unglamorous. A sink, because carrying things back into the house is what stops people using it. Power in more than one place. And a refrigerator rated for outdoor use, since an indoor unit in a Florida summer fails quickly and is not covered when it does.
Ventilation matters if there is a solid roof over it, because cooking under a covered lanai without a way for the heat and smoke to leave is unpleasant and, with a gas appliance, more than unpleasant.
The mistake worth avoiding is placing it against the house wall under the lanai, which puts the heat and the smoke exactly where people sit. Placing it at the edge of the covered area, or on its own island, gets it out of the seating.
The one item that must be got right at the start is the services. A gas line, a water line and a drain in the right place before anything is paved or built is straightforward, and adding any of them afterwards means cutting a slab.
How long it takes, and where the time goes
An addition here is a longer programme than the construction suggests, and most of the extra is before anybody picks up a tool.
Design and engineering come first, because an addition needs drawings that interior work does not, and where an existing structure is being built over, the existing structure has to be assessed as well as the new work designed.
Then community approval and the building permit, which run in parallel when somebody starts both early and in series when they do not. That single choice is the most common avoidable delay in this kind of project and it costs weeks rather than days.
Then construction, which for anything involving the roof or the slab is weather dependent in a way interior work is not, and which is planned around the forecast rather than the calendar.
Finishing is the long tail and it is where a project either lands or drifts, and it drifts when decisions were left open. Everything selected before demolition is the single practice that keeps a schedule honest.
We would rather quote a programme that includes the approvals than a construction duration that ignores them, because the second is how people end up feeling misled by a date that was not wrong, only incomplete.
What drives the cost
Five things carry the range here.
Whether the new space is conditioned or covered, which is the largest single difference in cost per square foot available.
What happens to the slab, since building a floor up to meet the house level and accepting a step are quite different numbers.
Whether the roof over the space has to be rebuilt or can be insulated and retained.
Whether the addition gets its own mechanical system, which we would usually recommend.
And how large the opening between the house and the new room is, because that is structural work in an exterior wall.
What a walkthrough covers
The first visit is short on diagnosis and long on measuring, which is the advantage of a house with no faults.
We check the fall across the existing slab, because that decides the floor question. We look at how the roof over the covered area is built and whether it is insulated. We look at what the perimeter structure actually is.
Inside, the panel and its capacity, the mechanical equipment and where it sits, and what the wall between the house and the space is doing structurally.
Outside, the setbacks and how much coverage is left, plus what the community requires and how long that approval takes.
Then the conversation about what is actually wanted, because a household asking for an enclosed room sometimes wants a shaded one, and those are very different projects.
Why choose a contractor who knows these plans
The villages here repeat a limited number of floor plans, which means if we have worked in your community we have probably already dealt with your exact covered area and know how it is built.
That shows up as an estimate with less contingency in it, because contingency is a contractor charging for their own uncertainty and we have less of it here.
Twenty-two years on the job also means being direct about the alternative. We would rather add fans, light, shade and power to the space you already have, for a fraction of the cost, than enclose it and hand you a room at the end of the ductwork.
If you are thinking about the space at the back of the house, the first question is whether you want it enclosed or you want it usable, and those have very different answers.
Service Areas
General contracting across Central Florida
General contracting across Lake, Orange, Polk and Osceola counties.
All Services
Everything we build
By Area
Home Additions and related services near Horizon West
FAQ
Frequently Asked Questions
Why is enclosing the lanai more expensive than it looks?
+
What do I do about the sloped slab?
+
Is enclosing it actually what I want?
+
Can the pool cage be built on?
+
Does enclosing the lanai use up my lot coverage?
+
Should the new room be on the existing air conditioning?
+
What about all that glass facing west?
+
Do I really need a permit to enclose a covered patio?
+
Ready to Build?