Free Kitchen Design
Free Kitchen Design
A full layout, a 3D view and an itemised quote, before you decide anything
Call (352) 630-3999What the free design actually is, and what it is not
It is a full kitchen layout, drawn to your measurements, priced cabinet by cabinet, with somebody who does this for a living on the other end of it. You keep it whether you order or not.
What it is not is a sales appointment with a drawing attached. Nobody comes to your house to sit at your table. The exchange happens on your schedule, the quote is itemised rather than presented as a single number designed to be accepted or rejected, and there is no version of this where the price goes up because you thought about it for a week.
The reason it works this way is not generosity. Cabinet work is won or lost at the layout stage, and a design that gets built badly costs everybody more than a design that never gets built. Doing the drawing first, properly, is how the good version of this job is protected. It also means that by the time anyone talks about ordering, both sides are looking at the same room.
The practical consequence for you is that you can find out what your kitchen would cost, laid out the way you actually want it, before deciding anything at all.
Measuring your kitchen, and the four measurements people get wrong
Everything downstream depends on this, and a bad measurement produces a design that has to be redone rather than adjusted. It is not difficult work, but it is specific.
Measure wall to wall at three heights, not one. Walls are not parallel and rooms are not rectangles, particularly in older houses. The number that matters is the smallest one, because that is what the cabinetry has to fit inside.
Measure to the finished surfaces you will actually have. If the tile is coming off, measure to the substrate and say so. If a wall is getting furred out for plumbing, that changes the depth available on that run.
Record the height of the ceiling in more than one corner. A ceiling that falls half an inch across a run decides whether tall cabinetry can be scribed in or has to stop short of it.
And mark every obstruction with a dimension from a fixed corner, not from another obstruction. Window sills, the centre of the sink drain, the gas stub, the electrical panel, the return air grille, the door swings. The grille and the panel are the two that get left off most often and the two that most often force a redesign, because neither can be covered.
There is a measurement guide that walks through this with a diagram, and it is worth ten minutes before you start rather than an hour of rework after.
What a three-dimensional rendering tells you, and what it hides
The rendering is the moment most people first understand what they are buying, and it is genuinely useful for a specific set of questions.
It answers proportion. Whether the tall run overwhelms the room, whether the island leaves enough space to open the dishwasher with somebody standing at the sink, whether the upper cabinets crowd the window. Those are the things that are almost impossible to judge from a plan and obvious in a rendering.
It answers relationship. How the door style reads next to the counter, how a two-tone scheme actually divides the room, whether the hardware disappears or announces itself.
What it does not answer is colour under your light. A rendering is lit by software, and your kitchen is lit by a window facing a particular direction and by whatever fixtures are in the ceiling. A warm white that looks crisp on a screen can read yellow under afternoon light from the west. This is the single most common surprise, and it is why a physical door sample in your own room is worth more than another round of rendering.
It also does not answer texture. Whether a finish feels sprayed or brushed, whether a profile has a soft edge or a sharp one, whether a wood grain is subtle or loud. Those are hand and eye questions, and twenty minutes with the real doors settles them.
How to read an itemised quote
A total tells you whether you can afford it. An itemised list tells you what you are buying and where the money can move, which is a different and more useful thing.
Read the box count first. Cabinetry is priced per unit, so the number of cabinets is the spine of the quote. If it looks high, the layout is probably using several narrow units where fewer wide ones would serve, and that is a design conversation rather than a price negotiation.
Then read the modifiers. Finish, door style, interior fittings and any non-standard dimension each carry a cost, and they are where two quotes for the same kitchen diverge. A quote that hides these inside a single number is not a quote, it is a proposal.
Then read what is excluded. Countertops, appliances, plumbing fixtures, tile, electrical work and disposal are frequently outside a cabinet quote and frequently assumed to be inside it. That assumption is the most common reason a kitchen budget breaks, and it breaks late.
Finally, look at what a change would cost. Knowing that swapping the door style moves the number by a known amount, rather than by an unknown one, is what makes the quote a tool for deciding rather than a document to approve.
The four steps, and what each one actually requires from you
The process is short, and the parts that need you are clearer if they are named.
First, you send measurements and a rough sense of what you want. Photographs of the room from two corners help more than a description does. This is the step where the measurement guide earns its keep.
Second, a designer confirms the details. This is a conversation rather than a form, and it is where the useful questions get asked: how many people cook at once, what is stored where today and what never gets reached, whether the layout should stay or move.
Third, you review the rendering and the itemised quote, on any device, and change whatever you want to change. Changing things here is the point of the exercise rather than an inconvenience to it. Most designs go through two rounds, and a design that goes through none is usually one where somebody stopped asking questions early.
Fourth, if you want it, you order. Not before, and not as a condition of any of the above.
Deciding the layout before deciding the look
Almost everybody arrives with a finish in mind and no opinion about the plan, and that is the wrong order.
Layout decides how the kitchen works for a decade. Finish decides how it looks, and it can be changed later at a cost that is real but bounded. A beautiful kitchen with the refrigerator opening into the main traffic path is a beautiful kitchen you will resent every day.
The questions worth settling first are about movement and storage. Where does the sink go relative to the window and the dishwasher. Whether the cook is facing the room or a wall. Whether two people can pass behind each other with a drawer open. Where the things you use daily live, and whether reaching them requires crossing the room.
Once the plan is right, the finish conversation gets easier rather than harder, because the room is no longer being asked to solve a problem that a colour cannot solve.
This is also the reason the design is free and comes first. A layout conversation is where the value of the whole project is decided, and holding it hostage to a deposit would produce worse kitchens.
Designing it yourself, and where that stops working
Plenty of people want to lay it out themselves first, and that is a good instinct. You know the room, you know how you cook, and you have opinions that no questionnaire will extract.
The self-designed layouts that work tend to be the ones that keep the plumbing where it is and treat the existing wall positions as fixed. That is not a limitation so much as a recognition of where the money is: moving a sink across a slab-on-grade kitchen is a real cost, and a layout that avoids it buys better cabinetry with the same budget.
Where self-designed layouts consistently break is in clearances and in the small dimensions. Doors and drawers that collide with each other or with an appliance. Corners where two runs meet and neither can open. Filler strips that were not planned for and now have to appear somewhere visible. An island that looks generous on paper and leaves a walkway that two people cannot share.
None of that means starting over. It usually means a few adjustments that somebody who builds these daily will spot in a first pass, and the result is your layout with the collisions removed.
What happens after you approve, and the part people forget
Approval starts the clock, and what happens next depends on which path the kitchen is on.
On the semi-custom path the cabinetry is sized and ordered against your measurements and arrives in days rather than weeks, which is why that path exists and who it serves.
On the fully custom path the cabinetry is manufactured after the order, and the room waits during that period. Knowing which path you are on before demolition is the difference between a kitchen that is out of service for a manageable window and one that is out of service for a season.
The part people forget is the final measurement. On a remodel, the room has to be measured again once it is in its finished state, because a wall that gets furred out or a floor that gets built up changes the space the cabinetry has to fit. That measurement is not a formality and it is the reason cabinetry is not ordered on the first drawing.
And the part worth planning for is the sequence after the boxes land. Countertops are templated on installed cabinetry, not before it, which puts a known gap between cabinet installation and a usable counter. Planning around that gap is better than discovering it.
What to have ready before you start
None of this is required to begin, and having it makes the first round useful instead of preliminary.
The appliance list matters more than anything else on this page. Cabinetry is built around appliances, not the other way round, and a refrigerator that turns out to be three inches wider than assumed moves every cabinet on that wall. Model numbers are better than dimensions, because a model number carries the door swing and the clearance requirements with it.
Photographs from two opposite corners, plus one of each wall straight on. They answer questions a plan cannot: where the light comes from, what the ceiling does, how the room connects to what is next to it.
A budget range you are actually willing to say out loud. A design drawn to a number that was never real wastes the round, and the second round then has to remove things that were only there because nobody said anything. A range is enough. It does not have to be a figure.
And a short list of what is wrong with the kitchen you have. Not what you want, which everybody has thought about, but what actually irritates you daily. That list produces better layouts than a folder of inspiration images, because it describes the problem instead of describing somebody else's solution.
Storage, which is where the specification is always too thin
Cabinet quotes are usually detailed about boxes and vague about what goes inside them, and the inside is where a kitchen is won.
A base cabinet with a fixed shelf and a door wastes most of its volume, because the back half is unreachable without kneeling. The same box with full-extension drawers holds the same things and gives them all back to you standing up. It costs more per unit and it is the single upgrade that changes daily life the most.
Corners are the other place. A blind corner with a door is storage you will use twice a year. The fittings that solve it are not cheap and they are worth specifying deliberately rather than discovering that the corner was left as it was because nobody raised it.
Then the specifics: where the rubbish goes, whether the recycling is in the same pull-out, where trays and sheet pans stand upright, whether the spices are near the cooking or near the dry goods. Each is a small decision and each is nearly impossible to add later without replacing a unit.
The useful exercise is to walk your current kitchen and name what is in every cabinet. Most people find two or three that hold nothing they use, and that is space the new layout can give to something else.
The layout mistakes a design round catches
These come up often enough to be worth naming, and all of them are cheap to fix on a drawing and expensive to fix afterwards.
The dishwasher on the wrong side of the sink for the person who actually loads it. It is a handedness question and nobody asks it, and it produces a lifetime of reaching across an open door.
An oven or a refrigerator whose door, when open, blocks the only path through the room. Renderings show this immediately and plans hide it.
Upper cabinets that run into the window casing, which is usually a matter of an inch and always looks like a mistake once it is built.
An island sized to the room rather than to the walkways around it. The rule that matters is what remains, not what fits: an island that leaves less than a comfortable passage on the working side turns the best feature of the kitchen into the reason people bump into each other.
And drawers that collide with the handle of the appliance next to them, which happens whenever a cabinet run meets an appliance without somebody checking the projection of both.
If you already have a quote from somewhere else
Bring it. Comparing two quotes for the same kitchen is genuinely useful and it is usually harder than it should be, because they are rarely written to the same structure.
The comparison that means something is unit by unit. Same box count, same sizes, same interior fittings, same finish grade. Two numbers that differ by thousands often differ because one of them includes soft-close hardware and full-extension drawers throughout and the other treats them as upgrades.
Check what each one assumes about the existing kitchen. Removal and disposal, plumbing disconnection and reconnection, electrical changes, and whether the counter is templated by the same people who set the cabinets. Those items move between quotes and they are real money.
And check the lead time each one is quoting against, because a price that looks better on a semi-custom line and a price on fully custom cabinetry are not comparable at all. They are different products with different calendars, which is the distinction the cabinetry page opens with.
If the other quote is better, that is a fine outcome and we would rather you knew. What is not fine is choosing between two numbers that were never describing the same kitchen.
Why it costs nothing, answered plainly
Free things invite suspicion, and the honest answer is more reassuring than a slogan.
The design costs us time, and the time is worth spending because a kitchen designed properly is a kitchen that gets built without argument, on a schedule that holds, by people who knew what they were walking into. The alternative, which is a rough number and a decision made in a showroom, produces the projects that go badly for everybody.
There is no obligation attached, no deposit, and no version of this where the drawing becomes a bargaining position. You keep the design and the quote. If you take them somewhere else, that is a result we would rather have than a kitchen built from a layout nobody checked.
What we ask in return is accurate measurements and a straight answer about the budget, because a design drawn to a number that was never real is a waste of both sides' time.
FAQ
Frequently Asked Questions
Is it actually free, or free until something?
+
Do I need to know what style I want before starting?
+
How accurate do my measurements need to be?
+
Can I lay it out myself and have you check it?
+
Will the rendering show me the real colour?
+
What is not included in the quote?
+
How long does the whole thing take?
+
Ready to Build?
Get your free evaluation today.
No-pressure consultation. We serve Lake, Orange, Polk and Osceola counties. Call us or request a visit online.