General Contractor in Central Florida
Call (352) 630-3999Which counties this page covers, and why the line between them matters
We work across four counties that meet near the western edge of the Orlando metro: Lake, Orange, Polk and Osceola. From the shop on Lake Nellie Road in Clermont, most of that area sits inside a thirty to forty minute drive, which is the practical reason the service area stops where it does. A crew that spends two hours a day in traffic is a crew that starts late and leaves early, and the homeowner pays for both ends of that.
The county line matters more than the mileage. Two houses four miles apart, on opposite sides of a boundary, answer to different building departments, different review queues, different local amendments and sometimes different zoning language for the same thing. A contractor who works one county well and treats the other three as an afterthought will discover this on your project rather than before it.
There is a second line that catches people, and it sits inside the counties rather than between them. Some of the fastest-growing places in this region are not incorporated cities at all. Horizon West in Orange County and Four Corners on the Osceola side are planned areas without a city hall of their own, which means the county issues the permit rather than a municipal office. Four Corners had a 2026 population of 68,365, which is larger than the city of Clermont, and it does not have a building department. Knowing which desk your address answers to is the first question, not a detail.
One state license, several county front desks
Contractor licensing in Florida is statewide. The same certification that lets a general contractor build in Lake County lets them build in Polk. What is not statewide is the permitting, and that is where the four counties diverge.
The general pattern across this region is consistent even where the details are not. A county building department issues permits for the unincorporated areas, and each incorporated city inside that county runs its own permitting for addresses within its limits. Osceola County works exactly this way: the county handles unincorporated addresses and the cities within it handle their own. So do the others. The practical consequence is that "Clermont" as a mailing address and "City of Clermont" as a permitting jurisdiction are not the same thing, and a fair number of homes with a Clermont address are permitted by Lake County rather than by the city.
Review time is a real variable, not a rounding error
Plan review in Osceola County runs roughly ten to twenty-one days depending on the type and complexity of the project. That is a normal range for this region and it is worth planning around rather than hoping past. Two things move a project through faster, and only one of them is under anyone's control. A complete application, with the drawings the office expects and the supporting documents attached, clears review faster than one that comes back with comments. What no contractor can influence is the size of the queue in the week you file.
The honest framing for a homeowner is this: ask your contractor to tell you the expected review window for your specific jurisdiction at the start, and treat any answer that sounds instant as a warning rather than a selling point.
The ground under your project
Central Florida sits on karst terrain. The limestone underneath is soluble, groundwater moves through it, and over long periods that creates voids. This is the geological reason sinkholes are a Central Florida conversation rather than a national one, and it has direct consequences for construction.
Sinkhole disclosure in Florida is not a zone anyone can look up. It is a duty at closing: a seller has to tell a buyer when an insurer has paid a sinkhole claim on that property, so it follows the property rather than the neighbourhood. What does reach a project is the ground, and the county may ask for a geotechnical report on lots in higher-risk areas. A sinkhole assessment can be required for new construction on certain lots. None of that means a property is unbuildable. It means the soil question gets answered before the foundation is designed rather than after it is poured.
What a geotechnical report actually buys you
Homeowners tend to see a soils report as a cost imposed by bureaucracy. It is more useful than that. The report tells the engineer what the foundation has to sit on, and the foundation design follows from it. A lot with poor bearing capacity might need a different footing, additional compaction or a modified slab, and knowing that during design is a line item. Discovering it during construction is a change order and a delay.
The same logic applies to the high ground. The Lake Wales Ridge runs through this region and the elevation change around Clermont and Minneola is unusual for Florida, which is why the area has hills at all. Sloped lots bring their own set of questions: drainage, retaining, how much fill is needed and where the water goes when it rains. These are solvable and they are common here. They are also the sort of thing that should appear in a scope before work begins.
Wind, flood and the building code across the region
Design wind speed varies across Florida by address, not by county, and the wind-borne debris boundaries do not follow political lines either. Being inland is not the same as being exempt. The requirement that comes out the other side affects the roof-to-wall connections, the fastening of sheathing and roofing, and the rating your windows and doors have to carry.
Flood is a separate system, tied to flood maps that are periodically revised, and it governs the elevation of a finished floor and what may be built below it. A property in this region can sit in a demanding wind category and outside any special flood hazard area, or the reverse. The two questions have to be asked separately, and the answers should come from the map rather than from the neighbor.
The building code itself is statewide, which removes a lot of the variation you would find in other states. What each jurisdiction adds on top is the local layer: setbacks, driveway width, tree protection ordinances, impervious surface limits, height restrictions in specific overlays. That layer is where the four counties in this region genuinely differ, and it is why the same addition can be routine at one address and require a variance at another.
What we build and remodel across the region
The work falls into recognizable categories, and the mix shifts depending on where in the region a project sits.
- Custom homes on your lot. Common in south Lake and along the growth corridors, from footing through certificate of occupancy.
- Additions. Room additions, second stories and lanai enclosures, tied structurally into the existing building.
- Whole-home remodeling. Including load-bearing changes, which pulls in engineering and a longer review.
- Kitchens and bathrooms. Where the coordination between cabinetry, electrical and plumbing is most of the work.
- Patios, screen rooms and outdoor living. Built to the wind requirements that apply at the specific address.
- Storm damage restoration. Structural repair after wind and water, documented the way an adjuster needs it.
In the older parts of the region, and Mount Dora and downtown Winter Garden are the clearest examples, the work tilts toward renovation of housing stock that has been standing for decades. In the newer corridors it tilts toward additions and finishing out what a production builder left undone. Those are different jobs with different risks, and pricing them the same way is how contractors get into trouble.
The approval your permit does not cover
A large share of the housing in this region sits inside a master-planned community or a homeowners association, and that creates a second approval that runs in parallel with the building permit. The association’s architectural review committee decides whether what you want to build is allowed by the community’s own rules, and its decision is independent of whether the county will permit it.
The two systems do not talk to each other, and homeowners routinely assume they do. A county can approve an addition that the association rejects on the grounds of setback, roof pitch, exterior color, fence height or material. The reverse also happens: an association can approve a design that will not clear plan review. Neither body is obliged to warn you about the other.
What that means for your schedule
Architectural review committees typically meet on a fixed calendar rather than continuously, which means the submission window matters. Missing a meeting can cost weeks that have nothing to do with construction. On projects that touch the exterior, the sensible order is to get the association’s approval in hand before drawings go to the county, so that a condition imposed by the committee does not force a revision to a set already in review.
The question to ask at the walkthrough is simply whether your property is in an association and what its submittal process looks like. If it is, ask for the design guidelines document. It is usually specific, occasionally unreasonable, and always cheaper to read before the design than after it.
Planning a project around hurricane season
The Atlantic hurricane season runs from June through November. Construction does not stop for it, but the exposure of a project is not constant across its phases, and that is what makes it worth planning around.
A building that is dried in, meaning roofed and with the openings closed, is in a very different position from one that is open framing. The sensible approach is to sequence the vulnerable phases so they are as short as possible and, where the calendar allows, to avoid having a structure open to the sky during the most active weeks. That is not always possible and pretending otherwise would be dishonest. What is always possible is knowing which phase you are in, and having a plan for securing the site when something is forecast.
There is a second effect that is easy to miss. After a significant storm anywhere in the state, materials and subcontractors get pulled toward the damage. A project that was moving normally can slow for reasons that have nothing to do with the job site. That is a regional reality, not an excuse, and the way a contractor handles it is by telling you it is happening.
What actually drives the cost of a project here
Four things decide most of the budget on a Central Florida project, and only one of them is visible when the work is finished.
Whether structure moves. Removing a load-bearing wall, changing a roofline or adding a second story pulls in engineering, different framing and a longer plan review. Two kitchens with identical finishes can differ enormously depending on whether one of them opened a wall.
Whether water moves. Relocating a drain line is a different job from replacing a fixture. Most of this region is slab-on-grade, which means going under the slab rather than under a floor, and that is meaningfully more involved.
Electrical capacity. Older houses frequently lack the panel capacity for what is being added. This gets discovered during construction unless somebody checked at the walkthrough, which is one of the reasons the walkthrough matters more than it looks.
The ground. On karst terrain and on the sloped lots around the ridge, the foundation and the drainage are not a formality. A geotechnical requirement discovered late is both a cost and a delay.
Impact fees, and why the number surprises people
New construction and some additions in this region carry impact fees, which are charges a jurisdiction collects to fund the roads, schools, parks and utilities that new building loads. They are assessed by the county or the city, they are separate from the permit fee, and they are often the largest single line item in the permitting portion of a budget.
Two things make them a recurring surprise. The rates differ between jurisdictions, so the same house costs a different amount to permit on either side of a line. And they get revised, so a figure someone quoted eighteen months ago may no longer be the figure. On a project where impact fees apply, the number should be confirmed with the issuing office for your address during budgeting rather than assumed from a comparable job.
Water, sewer, and the parts of this region that have neither
Not every address here is on city water and sewer. Substantial parts of Lake and Polk counties are on private wells and septic systems, and that changes several things at once. A septic system has a design capacity tied to the number of bedrooms, so an addition that adds a bedroom can require the system to be evaluated or enlarged. That is a health department question rather than a building department question, and it runs on its own timeline.
The same applies to a well when a project adds significant demand. Neither is a reason not to build. Both are reasons to know which system a property is on before a scope is written, because discovering it midway converts a straightforward addition into two permits and a wait.
Growth, and what it means for your project
This region is growing quickly, and the numbers are not subtle. Four Corners reached 68,365 people in 2026, growing at about four percent a year and up roughly forty-nine percent since 2020. Clermont reached 54,663 at about three and a half percent a year. Davenport nearly doubled since 2020 and is running near ten percent annually, and Haines City reached 45,973 with ten percent growth, placing it among the fastest-growing places of its size in the country. Minneola issued 469 residential building permits in 2024 worth roughly 161 million dollars, at about 344 thousand dollars per unit against a Lake County average nearer 284 thousand.
For a homeowner, that growth cuts two ways and both are worth knowing. Permit queues at busy offices reflect the volume going through them. Good subcontractors are in demand, and the ones worth having are booked in advance rather than available tomorrow. On the other side, the same growth is why the trades are here at all, and why materials and suppliers are close by rather than a long haul away.
How to choose a general contractor in Central Florida
The general advice applies everywhere. Here is the part that is specific to this region.
Ask which jurisdiction will issue your permit. Not the county, the actual issuing office. If the contractor has to look it up, that is fine. If they guess, that is the answer to a different question.
Ask whether they have worked in that jurisdiction recently. Review preferences change, and a contractor who filed there last month knows something a contractor who filed there in 2021 does not.
Ask about the ground. On a new build or a substantial addition, ask whether a geotechnical report is expected at your address and who is responsible for obtaining it.
Ask what is not included. A written scope with exclusions is more useful than one with inclusions, because the argument at the end of a project is always about something nobody wrote down.
Ask how you will be told when something changes. Every project changes. The difference between a good experience and a bad one is almost never whether something went wrong, it is whether you heard it from your contractor or found out yourself.
Starting a project with Sunshine State Builders
Sunshine State Builders is based at 7207 Lake Nellie Rd in Clermont and works across Lake, Orange, Polk and Osceola counties. The company holds a 4.8 rating across 33 Google reviews as of August 2026, and is built on twenty-two years of construction experience, five of those years holding the license.
A project starts with a walkthrough. We stand in the space, measure, and say what is realistic before anyone talks about money. If the honest answer is that what you want does not make sense at your address or at your budget, that is the answer you get at the walkthrough rather than three weeks into a design you paid for.
FAQ
Frequently Asked Questions
Which counties does Sunshine State Builders serve?
+
Does my Clermont address mean the City of Clermont issues my permit?
+
How long does plan review take in Central Florida?
+
Do I need a soils report because of sinkholes?
+
Are Horizon West and Four Corners cities?
+
Do I need HOA approval as well as a building permit?
+
Ready to Build?
Get your free evaluation today.
No-pressure consultation. We serve Lake, Orange, Polk and Osceola counties. Call us or request a visit online.